Entryway plan
Cedar Shoe Drying Rack for a Drip Mat
Lift wet soles onto five slats and leave the mat below.
- Width
- 18 in.
- Depth
- 12 in.
- Height
- 1½ in.
See the labeled assembly drawing
Assembly drawing
Offcut Journal editorialUpdated
Save this plan to find it alongside your build progress on this device.
Open saved plansBefore you cut
Check the fit at your bench
The deck measures 18 in. wide, 12 in. deep, and 1½ in. high. It has five 2 in. slats and four ½ in. gaps. Check it against the largest pair you actually leave by the door. Include the raised edges of your separate mat or tray when measuring and choose a mat with a flat landing area at least 18 × 12 in. wide.
The tops of the boots can look dry while the soles are still sitting in water. Set them on five slats over a washable mat. The half-inch gaps let you see what drained through, and you can lift the deck out when it’s time to wipe the mat.
Use screws from underneath and leave the crossing joints dry. If a slat wears out, undo its two screws and put a new one in the same spot.
Make a paper plan for the drip tray
Set tracing paper on your actual mat and mark the inner footprint of its flat bottom. Many trays have rounded corners or a rim that slopes inward, so the measurement over the lip can be larger than the space available to the runners. Sketch the two runners on the paper and put a stiff scrap in each position. They should both lie flat while the deck clears the lip. At final placement, trace the outline of the damp shoes from heel to toe. A sole extending beyond the mat can send water past the removable catcher even when the deck itself fits.
Recalculate the slats before changing the depth
Five 2-inch slats take up 10 inches of the 12-inch front-to-back dimension. The other 2 inches are divided into four gaps. If you reduce the depth to 11 inches and preserve five 2-inch slats, only four ¼-inch gaps remain. Compare them with the dirt your shoes tend to bring in. An alternative is to make five 1¾-inch slats and keep four ½-inch gaps, for a total depth of 10¾ inches. Rewrite the runner length and transfer the new center marks from a single paper strip. Make sure the new outside slats have the same overhang on both runners.
Check the slats with the heel turned
Put the narrowest pair that will use the deck over a full-size drawing of the five slats and four half-inch gaps. Check heel contact when the shoes sit a little off square. If a hard heel catches in a gap while the shoe is being lifted, choose a different mat or adjust the spacing before you cut. Keep the full deck inside its waterproof catch area and clear of the usual walking path.
Measured drawings
Use the top view for width and depth. Use the front or right-side view to check height.
- Overall width
- 18 in.
- Overall depth
- 12 in.
- Overall width
- 18 in.
- Overall height
- 1½ in.
- Overall depth
- 12 in.
- Overall height
- 1½ in.
Cut list
- Cut pieces
- 7
- Stock type
- 1
- Longest part
- 18 in.
Read each blank as length × width × thickness.
Metric is a reference conversion. Match the stock and assembly dimensions in the inch plan before cutting.
Choose a part letter to highlight it in the assembly.
| Part | Piece and stock | Qty | Cut size |
|---|---|---|---|
| A | Runner¾ in. solid wood | 2 | 12 × 1½ × ¾ in. |
| B | Slat¾ in. solid wood | 5 | 18 × 2 × ¾ in. |
Keep the cut list, tools, build order, and final check in one offline text file.
Download project briefCheck your offcuts
Match the actual thickness or dowel diameter first. A group’s longest and widest blanks can be different pieces. Lay out each part on your stock before cutting.
-
¾ in. solid wood7 pieces
- Longest blank
- 18 in.
- Widest blank
- 2 in.
Check both ends and the middle after surfacing. Match the actual thickness on paired rails or cheeks before marking their positions.
Allow room for the saw cuts, end trimming, and defects. Bring these part lengths to the Workbench
Supplies and tools
Supplies
- Ten #8 × 1¼ in. stainless flat-head wood screws
- Four temporary ½ in. spacers taken from scrap
- Separate waterproof shoe mat or boot tray
- Sandpaper and optional finish rated for the expected moisture exposure
Tools
- Tape measure
- Square
- Pencil
- Drill and driver
- Clearance and pilot bits matched to the screws
- Depth stop
- Countersink
- Clamps
- Sanding block
See each cut blank 2 part types
Use the cut sizes below. The silhouettes are sized to fit each card.
-
ARunnerCut 2
¾ in. solid wood
12 × 1½ × ¾ in.Length × width × thickness -
BSlatCut 5
¾ in. solid wood
18 × 2 × ¾ in.Length × width × thickness
Exact part positions
Measurements start at the lower front-left corner of the drawing. Each location marks the front-left bottom corner of that piece. For a round part, it marks the corner of the square that encloses it.
| Piece | From left | From front | From bottom |
|---|---|---|---|
| A Runner | 1 in. | 0 in. | 0 in. |
| A Runner | 15½ in. | 0 in. | 0 in. |
| B Slat | 0 in. | 0 in. | ¾ in. |
| B Slat | 0 in. | 2½ in. | ¾ in. |
| B Slat | 0 in. | 5 in. | ¾ in. |
| B Slat | 0 in. | 7½ in. | ¾ in. |
| B Slat | 0 in. | 10 in. | ¾ in. |
Build it
0 of 5 steps checked
Browse the illustrated steps
-
1. Choose flat stock
Select straight cedar or similarly suitable wood at a true ¾ in. thickness. Run the grain along the 18 in. slats and along the 12 in. runners. Set both runners on a flat surface and check that they sit without rocking. A twist in a runner is harder to fix once it has pulled all the slats into the same curve.
Check at the bench Both runners sit flat on the bench.
Check the fitRight-side viewThe runners and slats share a true ¾ in. thickness. Check the runners for twist before drilling.
-
2. Lay the slats face down
On a clean flat bench, arrange the slats best face down. Start with the front and back slats and space the three middle ones ½ in. apart using scrap. Push the left ends against a straight scrap. Then check the right ends for a short slat before you lay the runners across them. Leave the spacers in place for marking but keep them clear of the pilot holes.
Check at the bench The two outside edges sit 12 in. apart.
Dry fitUnderside layoutLay the five slats best face down, with ½ in. spacers between them and the ends against a straight scrap.
-
3. Place and drill the runners
Set the runners across the slats with their outside edges 1 in. in from their respective sides. Keep their ends flush with the deck's front and back. On each runner underside, mark its width centerline and put a screw at 1, 3½, 6, 8½, and 11 in. from the front. These marks put a single screw down the middle of each slat at each crossing.
Check at the bench Runner ends sit flush with the outer slats.
Mark outUnderside layoutCenter a screw over each crossing. The left runner shows all five positions measured from the front.
Plot the marked centers
Measure from the drawing’s left and front edges. The step lists pilot depth and any remaining centers.
Mark From left From front 1 in. 1¾ in. 1 in. 3½ in. 1¾ in. 3½ in. 6 in. 1¾ in. 6 in. 8½ in. 1¾ in. 8½ in. 11 in. 1¾ in. 11 in. -
4. Drive the screws from below
Drill clearance holes through the runners only and countersink the exposed side just enough for the heads to finish flush. Transfer the centers to the clamped slats through the clearance holes. Check a screw in a stack of two offcuts, then set the pilots for the depth it actually reaches. A 1¼ in. screw seated flush in a ¾ in. runner should reach about ½ in. into a slat. Assemble without glue and pull out the spacers after all ten screws are seated.
Check at the bench No screw tip breaks through a slat.
Join the partsFront elevationDrive the screws through the runners and about ½ in. into the slats, keeping every head flush underneath.
-
5. Finish and set in place
Hand-sand the upper slat edges and the ends that you'll lift the deck by. If using a finish, follow its directions for drying and cure before setting the deck on a mat. Lift the deck to wipe out standing water below the runners. Set it back once the mat and wood have had a chance to dry.
Check at the bench The deck lifts freely from the mat.
Surface prepAssembly viewEase the upper slat edges and the ends you’ll grip. Let the finish cure before setting the deck on its mat.
My bench notes
These notes stay in this browser.
If the fit is off
One gap is tight at one end. How do I fix it?
Check that all slats are exactly the same width. Loosen the two screws under the wayward slat, reset its ends with both spacers against the neighboring slat, and retighten. A width difference needs to be corrected at the board.
Why is the mat a separate piece?
You can lift the deck and empty or rinse the mat independently. Give both parts a chance to dry instead of treating the screw joints as watertight.


