OFFCUT JOURNAL · PROJECT BRIEF Cedar Shoe Drying Rack for a Drip Mat FINISHED SIZE (WIDTH × DEPTH × HEIGHT) 18 × 12 × 1½ in. BEFORE YOU CUT The deck measures 18 in. wide, 12 in. deep, and 1½ in. high. It has five 2 in. slats and four ½ in. gaps. Check it against the largest pair you actually leave by the door. Include the raised edges of your separate mat or tray when measuring and choose a mat with a flat landing area at least 18 × 12 in. wide. CUT LIST (LENGTH × WIDTH × THICKNESS; DOWELS: DIAMETER × LENGTH) A · Runner · Cut 2 · ¾ in. solid wood · 12 × 1½ × ¾ in. B · Slat · Cut 5 · ¾ in. solid wood · 18 × 2 × ¾ in. SUPPLIES Ten #8 × 1¼ in. stainless flat-head wood screws Four temporary ½ in. spacers taken from scrap Separate waterproof shoe mat or boot tray Sandpaper and optional finish rated for the expected moisture exposure TOOLS Tape measure Square Pencil Drill and driver Clearance and pilot bits matched to the screws Depth stop Countersink Clamps Sanding block BUILD STEPS 1. Choose flat stock Select straight cedar or similarly suitable wood at a true ¾ in. thickness. Run the grain along the 18 in. slats and along the 12 in. runners. Set both runners on a flat surface and check that they sit without rocking. A twist in a runner is harder to fix once it has pulled all the slats into the same curve. Check at the bench: Both runners sit flat on the bench. 2. Lay the slats face down On a clean flat bench, arrange the slats best face down. Start with the front and back slats and space the three middle ones ½ in. apart using scrap. Push the left ends against a straight scrap. Then check the right ends for a short slat before you lay the runners across them. Leave the spacers in place for marking but keep them clear of the pilot holes. Check at the bench: The two outside edges sit 12 in. apart. 3. Place and drill the runners Set the runners across the slats with their outside edges 1 in. in from their respective sides. Keep their ends flush with the deck's front and back. On each runner underside, mark its width centerline and put a screw at 1, 3½, 6, 8½, and 11 in. from the front. These marks put a single screw down the middle of each slat at each crossing. Check at the bench: Runner ends sit flush with the outer slats. 4. Drive the screws from below Drill clearance holes through the runners only and countersink the exposed side just enough for the heads to finish flush. Transfer the centers to the clamped slats through the clearance holes. Check a screw in a stack of two offcuts, then set the pilots for the depth it actually reaches. A 1¼ in. screw seated flush in a ¾ in. runner should reach about ½ in. into a slat. Assemble without glue and pull out the spacers after all ten screws are seated. Check at the bench: No screw tip breaks through a slat. 5. Finish and set in place Hand-sand the upper slat edges and the ends that you'll lift the deck by. If using a finish, follow its directions for drying and cure before setting the deck on a mat. Lift the deck to wipe out standing water below the runners. Set it back once the mat and wood have had a chance to dry. Check at the bench: The deck lifts freely from the mat. FINAL CHECK Set the deck flat on its mat, off the main walking path, and place shoes on it by hand. A corner should stay put when you press it lightly. Check that the heads underneath sit flush and that you can lift the deck without snagging the mat. FULL PLAN AND DRAWINGS In the offline site folder, open plans/slatted-shoe-drip-deck.html for measured drawings, hole locations, and fixes.