OffcutWoodworking Journal Find a plan

Pantry plan · The Perfect Fit

Reusable Bag Drying Rack with a Drip Tray

Keep each bag open and slide the drips out from underneath.

Finished dimensions
Width
14 in.
Depth
9 in.
Height
9½ in.
Finished view3D rendering
Open full image
Four slender pegs rise from two raised bars over a broad rectangular platform.
Color and finish are illustrative. Check the assembly drawing for the part labels and the supply list for hardware.
See the labeled assembly drawing

Assembly drawing

Reusable Bag Drying Rack with a Drip Tray illustrated in three-quarter view
Reusable Bag Drying Rack with a Drip Tray assembly drawing
Finished size14 × 9 × 9½ in.
Check the footprint in your spaceCompare the plan’s width and depth as drawn and turned.

Offcut Journal editorialUpdated

Before you cut

Check the fit at your bench

The base is 14 × 9 in. and the pegs top out at 9½ in. The two openings are spaced on centers 6 in. apart across the base. Each bag gets two ⅜ in. pegs 4 in. apart front to back, so its opening has to clear an outside peg span of 4⅜ in. With an empty wet bag over a test pair, look at the seam to see where water falls. Use a tray no wider than 12¼ in. and no deeper than 8½ in. in the 12½ in. opening under the bridge. Its rim must clear the 2½ in. height between base and crossbars.

Drip tray slidewayFront elevation
Marked width
12½ in.
Marked height
2½ in.
Front elevation.Drip tray slideway14 in.9½ in.Viewed from front

A reusable bag can look dry on the outside and hold a puddle in its folded corner. This countertop rack puts a pair of rounded pegs in each bag so the sides stay apart. The pegs stand on two suspended crossbars and a separate tray pulls out from below.

Start with the bags you already own. A four-inch peg spread is useful only if the zipper clears it without stretching. Make a quick test from two pencils before cutting the finished bridge.

Check which edges of the wet bag move

Use the zipper ends, gussets and folded corners as your reference points. Support an empty bag over the intended spots and see whether its front and rear faces hang apart along their full height. A stiff zipper can hold the mouth open while the lower folded gusset stays shut against one side. Shift the bag so both faces can hang freely, then check where that new position drops water on the tray. Mark the bag’s useful orientation on a removable tag during the test.

Clear the receiving counter before removing the tray

Tape the 14 × 9 in. footprint on the counter and pull your empty tray straight forward until it is free of the crossbars. You need that space available every time you empty the tray, including when a sink edge or soap bottle is nearby. Try lifting the empty tray level with the grip you can actually use. If room is tight, move the rack to a flat spot with a clear landing area in front.

Check the drip path when one bag is missing

Try a single clean bag over its two pegs in the dry fit. The seam may hang differently with the neighboring bag removed because the open flap has room to swing outward. Look straight down at the pan’s inside rim to see where the lowest seam projects. Reposition the pan before you close the bridge opening. Load light bags only and leave enough clearance to pull the pan straight out without disturbing the pegs.

Measured drawings

Use the top view for width and depth. Use the front or right-side view to check height.

Top viewFront edge
Overall width
14 in.
Overall depth
9 in.
Top view. Front edge at bottom.14 in.9 in.Front edge
Front viewViewed from front
Overall width
14 in.
Overall height
9½ in.
Front elevation.14 in.9½ in.Viewed from front
Right side viewFront at left
Overall depth
9 in.
Overall height
9½ in.
Right-side elevation. Front edge at left.9 in.9½ in.Front at left
Separated partsParts are separated to show where they meet. Follow the numbered build steps for assembly order.
Reusable Bag Drying Rack with a Drip Tray with parts separatedBADC

Cut list

Cut pieces
9
Stock types
4
Longest part
14 in.

Read blanks as length × width × thickness, and dowels as diameter × length.

PartPiece and stockQtyCut size
A Base¾ in. plywood 114 × 9 × ¾ in.
B Bridge side¾ in. solid wood 27½ × 2½ × ¾ in.
C Crossbar1½ in. solid wood 214 × 1½ × 1½ in.
D Drying peg⅜ in. dowel 4Ø ⅜ × 5¼ in.
Part locatorAll parts
Reusable Bag Drying Rack with a Drip Tray assembly drawing

Keep the cut list, tools, build order, and final check in one offline text file.

Download project brief
Check your offcuts

Match the actual thickness or dowel diameter first. A group’s longest and widest blanks can be different pieces. Lay out each part on your stock before cutting. Total dowel length excludes saw kerf and end trimming.

  • ¾ in. plywood1 piece
    Longest blank
    14 in.
    Widest blank
    9 in.

    Measure the sheet at several points along the edge. Use its actual thickness when checking widths between two panels.

  • ¾ in. solid wood2 pieces
    Longest blank
    7½ in.
    Widest blank
    2½ in.

    Check both ends and the middle after surfacing. Match the actual thickness on paired rails or cheeks before marking their positions.

  • 1½ in. solid wood2 pieces
    Longest blank
    14 in.
    Widest blank
    1½ in.

    Measure the block after flattening its reference face. Check the actual depth available below any blind hole before setting the stop.

  • ⅜ in. dowel4 pieces
    Longest peg
    5¼ in.
    Total cut length
    21 in.

    Turn the dowel in the calipers to check for an oval section. Confirm the widest reading fits the actual bore or socket.

Allow room for the saw cuts, end trimming, and defects. Bring these part lengths to the Workbench

Supplies and tools

Supplies

  • #6 × 1¼ in. wood screws for the sides
  • Four #8 × 2 in. wood screws for the crossbars
  • Wood glue for fixed joints and peg sockets
  • A removable low-rimmed waterproof drip tray
  • Wood finish suitable for the intended conditions, used per its label

Tools

  • Square, rule and pencil
  • Drill, bits matched to screw hardware, ⅜ in. bit and depth stop
  • Clamps and matching scrap
  • Wood saw and sanding block
See each cut blank 4 part types

Use the cut sizes below. The silhouettes are sized to fit each card.

  • ABaseCut 1

    ¾ in. plywood

    14 × 9 × ¾ in.Length × width × thickness
  • BBridge sideCut 2

    ¾ in. solid wood

    7½ × 2½ × ¾ in.Length × width × thickness
  • CCrossbarCut 2

    1½ in. solid wood

    14 × 1½ × 1½ in.Length × width × thickness
  • DDrying pegCut 4

    ⅜ in. dowel

    ⅜ × 5¼ in.Diameter × length
Exact part positions

Measurements start at the lower front-left corner of the drawing. Each location marks the front-left bottom corner of that piece. For a round part, it marks the corner of the square that encloses it.

PieceFrom leftFrom frontFrom bottom
A Base0 in.0 in.0 in.
B Bridge side0 in.¾ in.¾ in.
B Bridge side13¼ in.¾ in.¾ in.
C Crossbar0 in.1¾ in.3¼ in.
C Crossbar0 in.5¾ in.3¼ in.
D Drying peg3¹³⁄₁₆ in.2⁵⁄₁₆ in.4¼ in.
D Drying peg3¹³⁄₁₆ in.6⁵⁄₁₆ in.4¼ in.
D Drying peg9¹³⁄₁₆ in.2⁵⁄₁₆ in.4¼ in.
D Drying peg9¹³⁄₁₆ in.6⁵⁄₁₆ in.4¼ in.

Build it

0 of 6 steps checked

Browse the illustrated steps
  1. 1. Gauge the bags and drip trayBase, Bridge side
  2. 2. Build a square lower bridgeBase, Bridge side
  3. 3. Fasten from the baseBase, Bridge side
  4. 4. Set the crossbars before drilling pegsBridge side, Crossbar
  5. 5. Drill and fit the rounded pegsCrossbar, Drying peg
  6. 6. Dry the first bag over the trayBridge side, Crossbar, Drying peg
  1. 1. Gauge the bags and drip tray

    Test the zipper with a four-inch spread between two pencils. Bring the bottom corners of the bag down and check that it rests open and does not touch the counter. Measure the tray’s maximum width at the rolled rim, where many trays are widest. Check that the tray can pass between the bridge sides and that you can get fingers under its front edge.

    Check at the bench Measure the rim rather than the foot.

    Dry fit
    Front elevation
    Front elevation.14 in.9½ in.Viewed from front

    The bridge leaves twelve and a half inches between the sides for the low rimmed tray.

  2. 2. Build a square lower bridge

    Cut A 14 × 9 in. and both B sides 7½ × 2½ in. Set B flush with the outside edges and leave ¾ in. at the front and back. Dry-clamp over the base and try the tray. Mark three screw centers on each side footprint at 2, 4½ and 7 in. back from A’s front. Keep each line ⅜ in. in from its nearby side edge.

    Check at the bench Keep each line ⅜ inch from its edge.

    Mark out
    Underside layout
    Underside view. Front edge at bottom.14 in.9 in.Front edge · viewed from below

    Each side lands flush on the base with one centerline for three hidden screws.

    Plot the marked centers

    Measure from the drawing’s left and front edges. The step lists pilot depth and any remaining centers.

    MarkFrom leftFrom front
    1⅜ in.2 in.
    2⅜ in.4½ in.
    3⅜ in.7 in.
    413⅝ in.2 in.
    513⅝ in.4½ in.
    613⅝ in.7 in.
  3. 3. Fasten from the base

    Drill clearance through A and matching pilots into the B edges while the parts are clamped, proving the screw length on scrap. Countersink only until the heads are flush. Apply glue to each footprint and drive the screws. Recheck that the side panels are upright while the glue can still move so the tray does not pinch under a leaning side.

    Check at the bench Seat the screw heads flush.

    Join the parts
    Right-side view
    Right-side elevation. Front edge at left.9 in.9½ in.Front at left

    Clearance starts under the base and the pilots enter the lower edges of both bridge sides.

  4. 4. Set the crossbars before drilling pegs

    Cut both C bars 14 × 1½ × 1½ in. Their leading edges land at 1¾ and 5¾ in. from A’s front. Put one #8 screw at each end of the bar. Center the screw front to back in the bar and ⅜ in. from the nearest outside end. Clamp, drill and drive so the screw seats in the upper edge of B. Recheck your tray pull before installing the pegs.

    Check at the bench Slide the empty tray out level.

    Join the parts
    Top view
    Top view. Front edge at bottom.14 in.9 in.Front edge

    Two crossbars land on both sides and leave the entire center open above the tray.

    Plot the marked centers

    Measure from the drawing’s left and front edges. The step lists pilot depth and any remaining centers.

    MarkFrom leftFrom front
    1⅜ in.2½ in.
    213⅝ in.2½ in.
    3⅜ in.6½ in.
    413⅝ in.6½ in.
  5. 5. Drill and fit the rounded pegs

    Mark the crossbar centers at x = 4 and 10 in. from the left. The two y coordinates are 2½ and 6½ in. from the front of A. Practice a ½ in. deep blind socket on matching scrap before drilling each hole. Sand the tops of the D pegs round enough to avoid snagging, and dry-seat them to verify equal exposed lengths. Glue them upright and clear the squeeze-out.

    Check at the bench Test the bag on the pencil gauge.

    Drill and check
    Top view
    Top view. Front edge at bottom.LeftRight14 in.9 in.Front edge

    Each bag receives one peg at the front and one at the rear on the same centerline.

    Plot the marked centers

    Measure from the drawing’s left and front edges. The step lists pilot depth and any remaining centers.

    MarkFrom leftFrom front
    Left4 in.2½ in.
    24 in.6½ in.
    Right10 in.2½ in.
    410 in.6½ in.
  6. 6. Dry the first bag over the tray

    Let the assembled rack and finish cure per their labels before loading. Slide in the removable tray and lower an empty washed bag onto one peg pair. Look from the side to see if the bottom folds open, then look underneath to confirm drops land over the tray. Pull it out level to empty and wipe it, leaving the bridge where it is.

    Check at the bench Look underneath to locate each drip.

    Check the fit
    Assembly view
    Reusable Bag Drying Rack with a Drip Tray assembly drawingBDC

    The suspended peg pairs open the bags while the tray sits on the base beneath them.

If the fit is off

Why is water landing beside the tray?

Find the corner where the bag sags farthest. Center a tray under both bags, or use one pair at a time if the bag hangs beyond the rim. Avoid leaving water sitting on the plywood face.

Why does the tray catch on the bridge?

Pull it out empty and look where its rim rubs. Compare the width at the front and back of the side panels. A square tray with a flared rim may need a smaller model even if its foot fits easily.

Keep building

Drawing detail

Cut list

Swipe or scroll to see the whole drawing. Use +, −, and 0 to change zoom. The arrow keys pan while the drawing is focused.