OffcutWoodworking Journal Find a plan

Plants plan

Wooden Potting Tray with an Open Sweep Edge

Sweep soil straight off the bench without lifting a loaded tray.

Finished dimensions
Width
16 in.
Depth
10 in.
Height
2¾ in.
Finished view3D rendering
Open full image
Two side walls and a rear wall surround a flat potting surface with an open front.
Color and finish are illustrative. Check the assembly drawing for the part labels and the supply list for hardware.
See the labeled assembly drawing

Assembly drawing

Wooden Potting Tray with an Open Sweep Edge illustrated in three-quarter view
Wooden Potting Tray with an Open Sweep Edge assembly drawing
Finished size16 × 10 × 2¾ in.
Check the footprint in your spaceCompare the plan’s width and depth as drawn and turned.

Offcut Journal editorialUpdated

Before you cut

Check the fit at your bench

The tray is 16 × 10 × 2¾ in., with a clear floor 14½ in. wide and 9¼ in. deep. A flexible liner roughly 14¼ × 9 in. leaves finger room at the sides. Try its thickness at the open end and trim the front edge flush with the plywood so your brush has a smooth exit. Choose a catch pan that can come up against the front of the tray while the wooden base stays fully supported.

Put a dustpan against the front edge of a potting tray. A rim there makes the final pass with the brush a two-handed job. This tray has three walls and an open front, with the edge of the liner trimmed flush to the plywood below it.

Keep the dry brush on the tray while you work. Bring a dustpan to the same spot each time, sweep toward yourself in short strokes, and lift out the flexible liner when the soil sticks. The side walls follow the brush all the way to the exit.

Set a front edge you can find by feel

Different liners can feel the same when laid on the tray but behave differently with a brush. Mock up a short sample of the liner on a plywood offcut and hold it beside the receiving pan. Bring the brush across from the wooden side and notice whether it climbs the lip, dives underneath, or makes the liner creep. A soft liner can be trimmed with a straight cut so the leading edge lies flat. If the corner lifts after the first pass, try a different liner before committing the full sheet. Check the straightedge against the plywood front to rule out a dip in the board.

Make room for the pan and your sweep

Tape the 16 × 10 in. footprint onto the work surface and choose which side will face you. Set the actual pan in front with its handle in the position you want to reach. Do a short pass with the brush and then move the pan away from the line of the walls. A cramped corner can force the pan to tip while you lift it. Leave open surface beside the setup where you can park the pan upright. Check that the tray can remain fully on the bench while you place the pan, especially if the work surface has a rounded or beveled edge.

Keep the brush handle off the far wall

Practice sweeping a dry pile of scraps into the empty catch pan with the brush you actually use. On the 14½-inch-wide clear floor, a long handle can reach the back wall before the bristles follow the inside corner. Choose a shorter brush or change your sweep angle while the liner is still loose. Check that the brush can still travel across the open front without levering against the liner and pushing it into the catch pan.

Measured drawings

Use the top view for width and depth. Use the front or right-side view to check height.

Top viewFront edge
Overall width
16 in.
Overall depth
10 in.
Top view. Front edge at bottom.16 in.10 in.Front edge
Front viewViewed from front
Overall width
16 in.
Overall height
2¾ in.
Front elevation.16 in.2¾ in.Viewed from front
Right side viewFront at left
Overall depth
10 in.
Overall height
2¾ in.
Right-side elevation. Front edge at left.10 in.2¾ in.Front at left
Separated partsParts are separated to show where they meet. Follow the numbered build steps for assembly order.
Wooden Potting Tray with an Open Sweep Edge with parts separatedBCA

Cut list

Cut pieces
4
Stock types
2
Longest part
16 in.

Read each blank as length × width × thickness.

PartPiece and stockQtyCut size
A Floor¾ in. plywood 116 × 10 × ¾ in.
B Side wall¾ in. solid wood 210 × 2 × ¾ in.
C Back wall¾ in. solid wood 114½ × 2 × ¾ in.
Part locatorAll parts
Wooden Potting Tray with an Open Sweep Edge assembly drawing

Keep the cut list, tools, build order, and final check in one offline text file.

Download project brief
Check your offcuts

Match the actual thickness or dowel diameter first. A group’s longest and widest blanks can be different pieces. Lay out each part on your stock before cutting.

  • ¾ in. plywood1 piece
    Longest blank
    16 in.
    Widest blank
    10 in.

    Measure the sheet at several points along the edge. Use its actual thickness when checking widths between two panels.

  • ¾ in. solid wood3 pieces
    Longest blank
    14½ in.
    Widest blank
    2 in.

    Check both ends and the middle after surfacing. Match the actual thickness on paired rails or cheeks before marking their positions.

Allow room for the saw cuts, end trimming, and defects. Bring these part lengths to the Workbench

Supplies and tools

Supplies

  • 9 #6 × 1¼ in. flat-head wood screws
  • Wood glue and an interior finish suitable for incidental moisture, used according to its label
  • One flexible waterproof liner approximately 14¼ × 9 in., and a separate catch pan or dustpan

Tools

  • Tape, pencil and square
  • Clamps, drill, clearance bit, pilot bit, depth stop and countersink
  • Sanding block, 120- and 180-grit paper, and eye protection
See each cut blank 3 part types

Use the cut sizes below. The silhouettes are sized to fit each card.

  • AFloorCut 1

    ¾ in. plywood

    16 × 10 × ¾ in.Length × width × thickness
  • BSide wallCut 2

    ¾ in. solid wood

    10 × 2 × ¾ in.Length × width × thickness
  • CBack wallCut 1

    ¾ in. solid wood

    14½ × 2 × ¾ in.Length × width × thickness
Exact part positions

Measurements start at the lower front-left corner of the drawing. Each location marks the front-left bottom corner of that piece. For a round part, it marks the corner of the square that encloses it.

PieceFrom leftFrom frontFrom bottom
A Floor0 in.0 in.0 in.
B Side wall0 in.0 in.¾ in.
B Side wall15¼ in.0 in.¾ in.
C Back wall¾ in.9¼ in.¾ in.

Build it

0 of 5 steps checked

Browse the illustrated steps
  1. 1. Test the edge with your own brushFloor
  2. 2. Dry-fit the three wallsSide wall, Back wall
  3. 3. Mark the nine screwsFloor, Side wall, Back wall
  4. 4. Leave a clean front edgeFloor, Side wall
  5. 5. Set up a repeatable cleanupFloor, Side wall
  1. 1. Test the edge with your own brush

    Set the base on the bench with its best face up. Move your brush across it and into the receiving pan. The brush should clear the pan’s mouth without needing to tilt the tray. Choose the straighter long edge for the front and mark it on the underside before placing the side walls.

    Check at the bench Sweep into the dustpan without tipping the plywood.

    Dry fit
    Front elevation
    Front elevation.16 in.2¾ in.Viewed from front

    Hold the receiving pan below the top of the bare plywood so the brush crosses the edge smoothly.

  2. 2. Dry-fit the three walls

    Stand the side walls on edge with their outside faces flush to the left and right of the base. Lay the back wall between them against the rear edge. Put a square against each back corner, then lay the liner on the base and confirm there is enough room to pinch it between two fingers.

    Check at the bench Square both back corners and leave finger room beside the liner.

    Dry fit
    Top view
    Top view. Front edge at bottom.16 in.10 in.Front edge

    The side walls extend to the open front, while the rear wall fits between them at the back.

  3. 3. Mark the nine screws

    On the underside, mark holes ⅜ and 15⅝ in. from the left edge, each at 1½, 5 and 8½ in. from the front. Mark the back wall holes at 3, 8 and 13 in. from the left on a line 9⅝ in. from the front. Drill clearance holes through the plywood and countersink the heads flush. Clamp each wall over its marks and pilot into the wall through the clearance holes.

    Check at the bench Count three holes per wall before drilling the pilots.

    Drill and check
    Underside layout
    Underside view. Front edge at bottom.SideSideSideBackBackBack16 in.10 in.Front edge · viewed from below

    Two screw lines sit beneath the side walls and a third runs under the back wall.

    Plot the marked centers

    Measure from the drawing’s left and front edges. The step lists pilot depth and any remaining centers.

    MarkFrom leftFrom front
    Side⅜ in.1½ in.
    Side⅜ in.8½ in.
    Side15⅝ in.5 in.
    Back3 in.9⅝ in.
    Back8 in.9⅝ in.
    Back13 in.9⅝ in.
  4. 4. Leave a clean front edge

    Sand the faces before assembly. Break the exposed plywood edge just enough that it will stop catching the brush. Keep the edge straight and the wall glue surfaces square. Apply a thin layer of glue beneath each wall and screw them in place. Sight across the open end and remove squeeze-out from the floor before it dries.

    Check at the bench Run a finger across the sweep edge for splinters.

    Join the parts
    Front elevation
    Front elevation.16 in.2¾ in.Viewed from front

    Soften the sweep edge with a light pass before gluing the walls, keeping their bearing edges square.

  5. 5. Set up a repeatable cleanup

    Once the finish has cured, put the liner in with its front edge flush. Brush dry mix into the catch pan. For damp residue, lift the liner over a sink or waste bin and wipe it away from the wood. Empty any liquid promptly and set the tray and liner aside separately to dry.

    Check at the bench Brush a spoonful of dry mix cleanly into the pan.

    Check the fit
    Top view
    Top view. Front edge at bottom.16 in.10 in.Front edge

    Place the liner flush with the open front so a dry sweep reaches the pan without meeting a lip.

If the fit is off

Why does the brush flick soil over the sides?

Compare the brush width to the space you have between the pots. Sweep toward the front in short pulls from the rear corners. A brush that can reach the bare floor in each corner will move soil with less force.

How do I keep the liner from creeping toward me?

Lift out the liner and clear grit underneath it. A liner with a grippy back usually stays put better than slick film. Cut it to just under the inside footprint so it lies flat without curling up the walls.

Keep building

Drawing detail

Cut list

Swipe or scroll to see the whole drawing. Use +, −, and 0 to change zoom. The arrow keys pan while the drawing is focused.