Desk plan
Wooden Phone Stand with a Charging Cable Gap
Leave room for the plug your phone actually uses.
- Width
- 5 in.
- Depth
- 5 in.
- Height
- 5½ in.
See the labeled assembly drawing
Assembly drawing
Offcut Journal editorialUpdated
Save this plan to find it alongside your build progress on this device.
Open saved plansBefore you cut
Check the fit at your bench
The finished stand is 5 × 5 × 5½ inches. The two seat pads are each 1¼ inches wide, with a 1½-inch gap between them. Set your cased phone in portrait orientation across loose test blocks. The bottom edge needs to bear on both seats while the plug and its strain relief clear the base. Check with the cable you use, especially if the connector body is long. This layout suits a centered connector. An off-center port needs a moved gap.
Try standing your phone against a mug with its charging cable plugged in. A stiff connector can lift the whole phone off the desk. That little piece of plastic is the first thing to measure when you make a stand.
The phone sits on two blocks with a clear lane between them for the cord. The back panel goes up square. Move the blocks forward or back in the dry fit to find a screen angle you like. A cased phone and a bare one can sit quite differently on the same pair of blocks.
Find the new seat positions from the port
Draw the bottom edge of the case on a card and mark the center of the plug at its widest point. Transfer that centered plug mark to the base while you hold the card where the phone will sit. Set the seats on opposite sides of the marked opening and check that each still bears under a solid part of the case. An offset charging port can leave you with one side narrower than the original 1¼-inch seat. Fix its position with the actual phone and connector before marking the stop locations or drilling any hole in the 5-inch base.
Give the cord an easy route off the desk
Run the unplugged cable in the direction it will take once you put the stand where you want it. The connector may fit with the cable held straight and push upward once the cable turns toward the wall. Leave enough slack for the phone to lift a few inches before the wire pulls on the stand. A longer cable can curve over an open side of the desk without resting under the base. To see where it wants to go, mark the desk edge on the paper base template and recheck the connector while moving the free part of the wire by hand.
Check whether the case blocks one seat
Trace the cased phone’s lower edge onto stiff card, marking the corners, charging opening, and any molded feet. Put that outline over the 1½-inch gap. If one foot lands above the open channel, make a loose test with the real phone on both wood pads before changing the cuts. Keep both seats under sound bearing surfaces and leave the connector free of sideways pressure when the phone settles onto the back.
Measured drawings
Use the top view for width and depth. Use the front or right-side view to check height.
- Overall width
- 5 in.
- Overall depth
- 5 in.
- Overall width
- 5 in.
- Overall height
- 5½ in.
- Overall depth
- 5 in.
- Overall height
- 5½ in.
Cut list
- Cut pieces
- 6
- Stock types
- 2
- Longest part
- 5 in.
Read each blank as length × width × thickness.
Metric is a reference conversion. Match the stock and assembly dimensions in the inch plan before cutting.
Choose a part letter to highlight it in the assembly.
| Part | Piece and stock | Qty | Cut size |
|---|---|---|---|
| A | Base¾ in. plywood | 1 | 5 × 5 × ¾ in. |
| B | Back¾ in. solid wood | 1 | 5 × 4¾ × ¾ in. |
| C | Front stop¾ in. solid wood | 2 | 1¼ × 1¼ × ¾ in. |
| D | Raised seat¾ in. solid wood | 2 | 1¼ × ⅝ × ¾ in. |
Keep the cut list, tools, build order, and final check in one offline text file.
Download project briefCheck your offcuts
Match the actual thickness or dowel diameter first. A group’s longest and widest blanks can be different pieces. Lay out each part on your stock before cutting.
-
¾ in. plywood1 piece
- Longest blank
- 5 in.
- Widest blank
- 5 in.
Measure the sheet at several points along the edge. Use its actual thickness when checking widths between two panels.
-
¾ in. solid wood5 pieces
- Longest blank
- 5 in.
- Widest blank
- 4¾ in.
Check both ends and the middle after surfacing. Match the actual thickness on paired rails or cheeks before marking their positions.
Allow room for the saw cuts, end trimming, and defects. Bring these part lengths to the Workbench
Supplies and tools
Supplies
- Three #6 × 1¼ in. flat-head wood screws
- Wood glue
- Thin removable felt dots, optional
Tools
- Square, pencil, ruler and two small clamps
- Drill, clearance and pilot bits, countersink and depth stop
- Sanding block and 120- and 180-grit paper
See each cut blank 4 part types
Use the cut sizes below. The silhouettes are sized to fit each card.
-
ABaseCut 1
¾ in. plywood
5 × 5 × ¾ in.Length × width × thickness -
BBackCut 1
¾ in. solid wood
5 × 4¾ × ¾ in.Length × width × thickness -
CFront stopCut 2
¾ in. solid wood
1¼ × 1¼ × ¾ in.Length × width × thickness -
DRaised seatCut 2
¾ in. solid wood
1¼ × ⅝ × ¾ in.Length × width × thickness
Exact part positions
Measurements start at the lower front-left corner of the drawing. Each location marks the front-left bottom corner of that piece. For a round part, it marks the corner of the square that encloses it.
| Piece | From left | From front | From bottom |
|---|---|---|---|
| A Base | 0 in. | 0 in. | 0 in. |
| B Back | 0 in. | 4¼ in. | ¾ in. |
| C Front stop | ½ in. | 2 in. | ¾ in. |
| C Front stop | 3¼ in. | 2 in. | ¾ in. |
| D Raised seat | ½ in. | 2¾ in. | ¾ in. |
| D Raised seat | 3¼ in. | 2¾ in. | ¾ in. |
Build it
0 of 5 steps checked
Browse the illustrated steps
-
1. Mark the base from one corner
Pick the front-left corner of the base as your datum. Draw the front-stop line 2 inches back from the front. The stops begin ½ inch and 3¼ inches from the left. Put the seats immediately behind the stops, beginning 2¾ inches from the front. Keep the bare 1½-inch center lane continuous.
Check at the bench Seat fronts at 2¾ inches.
Mark outTop viewEach raised seat begins immediately behind its front stop. The clear lane continues between both pairs.
-
2. Try the phone and cable together
Clamp the back panel flush with the rear edge, square to the base. Secure the seats and stops temporarily with tape so they can hold the phone during the test. With the cable disconnected from power, check whether its plug body clears the base and its strain relief can follow a relaxed bend. Record any new seat setback from the front edge before lifting the mock-up.
Check at the bench Test the actual plug under the phone.
Dry fitRight-side viewThe seat sits forward of the vertical back, giving the phone a place to lean with its lower edge supported.
-
3. Drill for the back panel
At 4⅝ inches from the front, mark underside screw centers at 1, 2½, and 4 inches from the left. Drill clearance holes through the base and countersink the heads flush. Clamp the back panel in position and drill centered pilots that reach about ½ inch into its lower edge. Follow the screw maker’s pilot guidance for your wood.
Check at the bench Centers 4⅝ inches from the front.
Drill and checkUnderside layoutAll three clearance holes line up beneath the middle of the back panel’s lower edge.
Plot the marked centers
Measure from the drawing’s left and front edges. The step lists pilot depth and any remaining centers.
Mark From left From front 1 1 in. 4⅝ in. 2 2½ in. 4⅝ in. 3 4 in. 4⅝ in. -
4. Use a spacer between the stops
Tape the face of a true 1½-inch spacer so glue wipes off. Set it between the front stops and align their front faces against a straight caul at the 2-inch line. Clamp the stops lightly to the base, then glue the two seats directly behind them. Lay a straightedge across both seats to check they sit level with each other. Lift the spacer and clear squeeze-out from the cable lane.
Check at the bench Keep the center lane 1½ inches wide.
Join the partsFront elevationThe stops face forward at the same height. The two lower seats sit level behind them.
-
5. Attach the back and soften the edges
Glue the back at its footprint and drive its screws from below while the square holds the panel upright. After cure, round the upper edges that touch the case and sand the deck. If you add felt pads, use equal thicknesses and keep them clear of the central gap.
Check at the bench Top of the back panel stays upright.
Join the partsRight-side viewThe back panel sits flush with the rear of the base, with a square corner at its foot.
My bench notes
These notes stay in this browser.
If the fit is off
The connector bumps the base
Measure how far the actual plug hangs below the phone. Mock up taller seats before committing to new pads, and raise the front stops by the same amount to preserve their grip. Check reach and balance again with the case installed.
The phone rocks from side to side
Remove the phone and lay a ruler across both seats. One pad often sits proud because of trapped glue. Flatten the high pad with a sanding block, then check the phone case for raised corners before adding any felt.


