Short answer

Set the platform on the surface that will locate it and decide which attachment you will lose access to first. Make a dry stack with the real stock, then lift each level off in turn. Be sure the feet still meet the reference and the deck rests where the drawing says it should before making any level permanent.

Save, download or print

Take the key instructions with you as a text file you can open offline.

Download bench card

Method sketchUse your own measurements with this sketch.
Open full drawing
How to Dry-Assemble a Footed Platform With a Deck Above It — technique sketch and worked example

Method sketch

Scroll in the drawing area to read small labels.

Gauge the actual opening The dashed line measures the clear space between the two sides.

At the bench

Keep the reference beneath the stack

Use a flat area wide enough to support the whole setup as drawn. Mark the contact line on a scrap or establish it with a straight reference you can still see. Check the underlying pieces again when replacing a deck. An upper piece can hide a foot that shifted while you were working above it.

Plan which hardware is reachable from below

Draw the fastener route and rehearse the installation position on the empty prototype. Look for a tool or finger that needs to enter between two feet. If you must turn the stack over, use the same reference marks so you can return it to the correct orientation.

Separate the stacked tests

Check footing with the deck in place, then separate out upper and lower contacts during diagnosis. Confirm each level is as drawn without expecting the next to draw it into alignment. If a part is intended to come out for cleaning, include that motion when assembling the rehearsal stack.

Leave a small set of orientation marks

Put discreet marks on the back of each matched piece before taking the mock-up apart. Identify one starting corner and the surface it references. Copy the useful order to the working plan so you know which layer needs inspection just before the other covers it.

Make an underside mark that survives a flip

For the two supports in the dry stack, put small matching orientation marks on each foot and on the corresponding underside bearing location of the deck. Place them just away from the joining surfaces. When it is time to reach hardware below, lift the deck, turn it, and check that both feet still have an unambiguous position. Return the dry parts to the flat reference and test opposite corners for any shift. This is especially helpful when one support has an eased end or a face that was fitted individually. A deck can cover a reversed support until you compare which of its faces actually bears.