OFFCUT JOURNAL · PROJECT BRIEF Wooden Wallet and Watch Stand with an Open Saddle FINISHED SIZE (WIDTH × DEPTH × HEIGHT) 9 × 5½ × 5 in. BEFORE YOU CUT The finished stand measures 9 × 5½ × 5 in. The wallet pocket is 4¾ in. wide across the stops and 1 in. deep. Leave about ⅛ in. of loose room for the fold to slide in and out. The saddle is 2¾ × 2 in. Set your watch on a scrap cut to that footprint before drilling. Check that the case sits flat with both straps open. CUT LIST (LENGTH × WIDTH × THICKNESS; DOWELS: DIAMETER × LENGTH) A · Base · Cut 1 · ¾ in. plywood · 9 × 5½ × ¾ in. B · Wallet back · Cut 1 · ¾ in. solid wood · 4¾ × 2¾ × ¾ in. C · Wallet stop · Cut 1 · ¾ in. solid wood · 4¾ × ⅝ × ¾ in. D · Saddle post · Cut 1 · 1½ in. solid wood · 3½ × 1½ × 1½ in. E · Watch saddle · Cut 1 · ¾ in. solid wood · 2¾ × 2 × ¾ in. SUPPLIES Eight #6 × 1¼ in. flat-head wood screws Wood glue, sandpaper, and an indoor wood finish Optional 2½ × 1¾ in. thin felt pad with removable adhesive TOOLS Tape measure Square Pencil Drill and driver Clearance and pilot bits matched to the screws Depth stop Countersink Clamps Sanding block BUILD STEPS 1. Draw the wallet lane Place the front stop ½ in. from the left and ¾ in. back from the front of the base. Place the taller back at the same left offset and 2½ in. back from the front. Run grain left to right in both pieces. Try your folded wallet between them and pick it out with one hand. Adjust the back position before drilling if your wallet needs more room. Check at the bench: A loaded wallet lifts out by one corner. 2. Set the saddle over the post Mark the 1½ in. square post 6½ in. from the left and 2¾ in. back from the front. Stand it vertically with the grain. The saddle starts 5⅞ in. from the left and 2½ in. from the front. Turn it so it overhangs ⅝ in. on both sides of the post and ¼ in. at the front and back. Check at the bench: The saddle projects evenly on both sides. 3. Mark and drill the base On the base underside, mark the front-stop screws 1⅛ in. back and the back screws 2⅞ in. back. On both lines set centers at 1½ and 4¼ in. from the left. If you moved the back, use the center of its new footprint instead. For the post, put two centers at 6⅞ and 7⅝ in. from the left, both 3½ in. back. Drill and countersink the six clearance holes. Check at the bench: Use the new centerline if you moved the wallet back. 4. Assemble the two sides Use the clearance holes to mark the pilots. Keep the pilot depth into the thin front stop to about ½ in. and check the screw tip against the actual stack before driving it. Glue the footprint for each upright and fasten from below. From above the saddle, center two screws directly over the existing pair at the bottom of the post. Countersink only until the flat heads sit flush. Check at the bench: Both flat heads sit flush with the saddle. 5. Soften the watch saddle Ease the top saddle edges by hand, especially at the front and back where the straps drape. Finish the project as directed by the label and let it cure before placing leather on it. Add the removable felt after curing if you prefer softer contact for the watch and to cover the flush hardware. Check at the bench: Both straps bend over smooth edges. FINAL CHECK Press gently on the two ends of the saddle to check that it stays flush on its post. Set the folded wallet in its pocket and lift it out. Check that the watch saddle's fastener heads are flush before putting your watch down for the night. FULL PLAN AND DRAWINGS In the offline site folder, open plans/wallet-and-watch-stand.html for measured drawings, hole locations, and fixes.