OFFCUT JOURNAL · PROJECT BRIEF Two-Tier Wooden Thread Rack for Eight Spools FINISHED SIZE (WIDTH × DEPTH × HEIGHT) 9 × 6½ × 3½ in. BEFORE YOU CUT The pin centers are 2 in. apart along a row. The layout suits spools up to 1¾ in. across with room to lift them between neighbors. The sample uses ¼ in. dowels. Try one dowel offcut inside every style of spool and confirm it slips out easily. When using small-bore spools, replace the dowel and bit as a pair and check the fit on scrap. CUT LIST (LENGTH × WIDTH × THICKNESS; DOWELS: DIAMETER × LENGTH) A · Base · Cut 1 · ¾ in. plywood · 9 × 6½ × ¾ in. B · Rear deck · Cut 1 · ¾ in. plywood · 8¼ × 2 × ¾ in. C · Spool pin · Cut 8 · ¼ in. dowel · Ø ¼ × 2⅜ in. SUPPLIES A 24 in. length of ¼ in. hardwood dowel to cut the eight pins Wood glue Optional clear interior finish and four matching felt feet TOOLS Square and sharp pencil Drill with a ¼ in. bit and depth stop Clamps and a backing scrap Sanding block BUILD STEPS 1. Seat the broadest spools on paper Draw the base full size. Pencil the front line 1½ in. back, the rear line 4⅝ in. back, and the four centers on each at x = 1½, 3½, 5½ and 7½ in. Put the broadest spools where they would be closest. Set a ¾ in. scrap under the back row and lift one of its spools by the rim. Your fingers need clearance as well as the spool itself. Check at the bench: Your fingers can lift the rear spool by its rim. 2. Mark and drill before glue-up Center the rear deck across the 9 in. base, with its front at 3⅝ in. and ⅞ in. of the base visible behind it. Mark the upper row at the center of the deck’s depth and the same x measurements as the front row. Clamp each part flat and drill eight ⅜ in. deep blind holes from its top face. Test the drill setup and one dowel fit on a scrap of the same thickness first. Check at the bench: A test pin bottoms in a ⅜ in. hole. 3. Fit out a dry rack Cut eight pins 2⅜ in. long and lightly round their exposed tips. Find a pin that starts easily by hand and use it to test all the holes for depth and wiggle. Sand a tight pin evenly around its circumference and keep track of the hole it fits. Check at the bench: A seated pin enters by hand without visible wobble. 4. Raise the rear row Glue the rear deck to the center of the marked footprint, with both ends ⅜ in. inside the base edges. Clamp it flat until the glue cures. Clean glue from the exposed ledge before it hardens so a spool sitting on the base stays level. Check at the bench: The ledge lies flat and free of glue beads. 5. Install and line up the dowels Work a thin amount of glue around each hole wall, press each pin home, and use a square against the plywood face to bring it upright in both directions. Allow the glue and any finish to cure before returning the thread. Four matching felt pads can protect a smooth cabinet top. Check at the bench: Each pin stays upright when you remove the square. FINAL CHECK Set the largest spools in diagonally opposite corners and lift each one at a time. The pins should stay vertical, the spools should release comfortably and the stand should remain steady. FULL PLAN AND DRAWINGS In the offline site folder, open plans/two-tier-thread-spool-stand.html for measured drawings, hole locations, and fixes.