OFFCUT JOURNAL · PROJECT BRIEF Wooden Shoe-Care Tote for Brushes and Polish FINISHED SIZE (WIDTH × DEPTH × HEIGHT) 14 × 7 × 6¾ in. BEFORE YOU CUT The tote measures 14 × 7 × 6¾ in. overall. Inside the low walls, the floor is 12½ × 6 in. The handle underside is 5¾ in. off the table and 2 in. above the side-wall tops. Lay your gear inside the outline first. Measure any taller containers with their caps on. Place them in the front or rear bay, where the handle won’t be over their mouths. CUT LIST (LENGTH × WIDTH × THICKNESS; DOWELS: DIAMETER × LENGTH) A · Base · Cut 1 · ¾ in. plywood · 14 × 7 × ¾ in. B · Low wall · Cut 2 · ½ in. solid wood · 12½ × 3 × ½ in. C · End panel · Cut 2 · ¾ in. solid wood · 7 × 6 × ¾ in. D · Carry handle · Cut 1 · ¾ in. solid wood · 12½ × 1½ × ¾ in. E · Handle block · Cut 2 · ¾ in. solid wood · 1½ × ¾ × ¾ in. SUPPLIES Eighteen #6 × 1¼ in. flat-head wood screws Wood glue for the wall footprints and handle-block faces Sandpaper and an indoor wood finish TOOLS Tape measure Square Pencil Drill and driver Clearance and pilot bits matched to the screws Depth stop Countersink Clamps Sanding block BUILD STEPS 1. Arrange the parts Run grain along the length of the low walls and handle, front to back on the end panels, and along the 1½ in. dimension of the support blocks. Place the end panels over the two short edges of the base. Set the low walls between them with the fronts flush to the long edges. Label the inside face of each end panel. Check at the bench: The outside faces sit flush with the base edges. 2. Prepare the base screws On the underside, mark the low-wall screws ¼ in. in from each long edge at 2¼, 7, and 11¾ in. from the left. Mark the end-panel screws ⅜ in. in from each short edge at 1½, 3½, and 5½ in. back from the front. Drill clearance holes through the base. Countersink on the underside and transfer the holes to the clamped work for piloting. Check at the bench: Countersink on the side that will face the bench. 3. Mount the blocks on the ends With each end panel lying inside face up, lay a block 2¾ in. back from the front edge and 4¼ in. up from the bottom edge of the panel. Its top sits 5 in. up from that same bottom edge. Use two screws from the exterior, centered 4⅝ in. up from the bottom and 3⅛ and 3⅞ in. back from the front. Clamp the block to the end panel along the layout lines. Make clearance holes through the panel and matching stopped pilots into the block. Then glue the mating face and fasten the block from the outside. Check at the bench: Use the two outer screw positions from the end. 4. Bring the tote together Glue the footprints at the base, set the ends and walls upright, and fasten them from underneath. Check the handle fit between the ends with the tote resting on the bench. Ease the handle's long edges and begin the rounded grip slightly beyond each block so the bearing surfaces remain flat. Check at the bench: The grip sits flat on both blocks. 5. Fasten the grip and finish Stand the handle on the blocks, centered front to back. From above, fasten one screw over each block at 1⅛ and 12⅞ in. from the left and 3½ in. back from the front. Use clearance holes in the handle and depth-limited pilots into the blocks. The top screws run between the two horizontal screws at each end. Clean up the joints and let the glue and finish cure before carrying the tote. Check at the bench: Both grip screws land between the horizontal screws. FINAL CHECK Test the empty tote over the bench. Set it down and check for a loose grip, exposed fastener heads, or rocking at the base. Add a light kit of brushes, cloths, and closed polish tins. Shift the contents until the tote sits level in your hand. FULL PLAN AND DRAWINGS In the offline site folder, open plans/shoe-care-tote.html for measured drawings, hole locations, and fixes.