OFFCUT JOURNAL · PROJECT BRIEF Leather Strap Edge-Paint Drying Rack FINISHED SIZE (WIDTH × DEPTH × HEIGHT) 20 × 8 × 14¼ in. BEFORE YOU CUT The rail has hook centers at 4, 8, 12, and 16 in. across the inside span. Measure the length of the strap you want to hang, then hang an empty clip from one of the real hooks and measure how much vertical clearance it uses. The assembled beam underside is 13½ in. above the bench and the base top is ¾ in. high, giving 12¾ in. before hardware and liner. Keep the end of each test strap clear of the liner, neighboring straps, and both posts. Use a longer setup for a full-length belt. CUT LIST (LENGTH × WIDTH × THICKNESS; DOWELS: DIAMETER × LENGTH) A · Base · Cut 1 · ¾ in. plywood · 20 × 8 × ¾ in. B · Upright · Cut 2 · ¾ in. solid wood · 12¾ × 4 × ¾ in. C · Hanging rail · Cut 1 · ¾ in. solid wood · 18½ × 1½ × ¾ in. D · Foot cleat · Cut 2 · 1½ in. solid wood · 3½ × 1½ × 1½ in. E · Rail cleat · Cut 2 · 1½ in. solid wood · 1½ × 1½ × 1½ in. SUPPLIES ¾ in. flat plywood for the base and straight ¾ in. solid stock for uprights and rail 1½ in. square solid stock for the four cleats Twelve #8 × 1¼ in. flat-head wood screws Wood glue Four small screw eyes with threads short enough for the ¾ in. rail Four compatible removable clips or clips on short closed loops A removable liner compatible with your edge paint TOOLS Square, rule and pencil Suitable saw for secured stock Drill, compatible bits and countersink Clamps Fine abrasive block BUILD STEPS 1. Measure the actual hang Hold an uncoated sample strap on the clip you intend to use. Measure from the hook attachment point to the bottom of that strap. Check it against the 12¾ in. gap above the naked base before accounting for the hook shank and liner. Lay the four sample straps out with their centers 4 in. apart. Give fingers and clip handles room to pass. Check at the bench: A clipped dry strap clears the liner. 2. Make both uprights square Cut the base to 20 × 8 in. and cut the uprights to 12¾ × 4 × ¾ in. Align them face to face and compare their top and bottom edges. On the base, mark both footprints with their fronts 2 in. back and their outside faces inset ¾ in. from the nearest ends. Make each 3½ in. foot cleat and both 1½ in. rail cleats from 1½ in. square stock. Check at the bench: Dry posts match and sit on their entire lower edges. 3. Fasten and brace the feet Set the foot cleats against the inward faces of the uprights, with the cleat fronts at 2¼ in. from the front of the base. Mark four underside fastener points at x distances 2¼ and 17¾ in. from the left, paired with y distances 3 and 5 in. from the front. Use glue at clean mating faces. Put two horizontal screws from each upright's outside face into its cleat at 3½ and 4½ in. from the front and 1½ in. up from the bench. Test pilots and screw reach on matching offcuts. Check at the bench: The base stays flat while the side joints close. 4. Fit the ledgers and beam Place both small rail cleats against the inner posts with their tops flush at 13½ in. from the bench. Use one horizontal screw through each post into its cleat at the center, 4 in. from the front and 12¾ in. up from the bench, along with glue on the flat joint faces. Place the 18½ × 1½ in. rail across the posts. Screw it down into the cleats at x distances 2¼ and 17¾ in. and y distance 4 in. Drill the pilot holes and test reach before fastening. Check at the bench: The rail sits level across the uprights and ledgers. 5. Lay out hooks with room for the threads On the underside of the beam, center the four holes 4 in. from the front of the base, at x distances 4, 8, 12, and 16 in. from the overall left edge. Drill matching pilot holes to the proper depth for the chosen eyes. Ensure the eyes seat while their tips stay within the rail. Check that the looped hardware cannot slip sideways off its connection. Check at the bench: Each eye seats without its point reaching the top. 6. Hang four dry pieces before adding paint Put the liner below the clips. Hang the four dry sample pieces separately and see how each swings during loading and unloading. Keep room for their wet edges, then put on the clips at clean waste tails. Use the coating according to its label and keep the loaded rack on a firm, stable surface outside busy paths. Check at the bench: A swinging dry strap misses both neighbors. FINAL CHECK Load and lift out four representative dry straps in turn. Their ends should hang above the liner, their neighbors should stay clear, and the rack should stay in place. FULL PLAN AND DRAWINGS In the offline site folder, open plans/leather-strap-edge-paint-drying-rack.html for measured drawings, hole locations, and fixes.