OFFCUT JOURNAL · PROJECT BRIEF Wooden Right-Angle Jig for Box Glue-Ups FINISHED SIZE (WIDTH × DEPTH × HEIGHT) 9 × 9 × 1¼ in. BEFORE YOU CUT The square is 9 × 9 × 1¼ inches. The front and left rails leave a 7½-inch open span from the inside corner along each reference face. Their working height is ¾ inch above the plywood base. Try your box parts against scrap at the same height before assembly. This fixture is for alignment at the bench, with light hand-clamp pressure. A taller rail can give deep parts more bearing face if your clamps still reach the seam. CUT LIST (LENGTH × WIDTH × THICKNESS; DOWELS: DIAMETER × LENGTH) A · Square plywood base · Cut 1 · ½ in. plywood · 9 × 9 × ½ in. B · Front reference rail · Cut 1 · ¾ in. solid wood · 9 × 1½ × ¾ in. C · Left reference rail · Cut 1 · ¾ in. solid wood · 7½ × 1½ × ¾ in. SUPPLIES Wood glue and flat scrap clamp pads. Optional smooth release tape on the exposed base near future glue joints. TOOLS Reliable square Straightedge Pencil or fine marker Steel rule or tape Three or more clamps Sanding block BUILD STEPS 1. Confirm the faces first Check the plywood for twist by pressing its four corners on a flat bench. Choose straight inside faces on the rails. Set the front rail flush with the front of the base. The left rail begins at the back edge of the front rail and runs toward the rear. Mark the inside reference faces so they stay oriented through glue-up. Check at the bench: Press all four corners to check for base twist. 2. Set the long rail while the second stays loose Glue the long rail to the base and clamp it flush with the front edge. Let that joint cure on a flat bench. Put the left rail in place without glue and check that the two inside faces meet at a clean corner. You will set their final angle from those faces. Check at the bench: Keep the long rail flush with the front edge. 3. Set the inside corner Spread a thin coat of glue beneath the second rail. Clamp it lightly to the base. Put a verified square against the working faces and shift the free end of the second rail until the faces line up. Check that the clamp cannot push the rail sideways as you increase pressure. Remove glue from the inside corner now. Check at the bench: Clean squeeze-out from the corner before it hardens. 4. Measure the cured angle independently After the glue cures, mark point A 4½ inches along the front reference face and point B 6 inches along the left reference face. Measure both from the inside corner and keep them at the same height. The straight diagonal from A to B measures 7½ inches at a right angle. Recheck with your square. If the marks are hard to read, transfer the two straight lines and the marks to thin card before measuring. Check at the bench: Set both marks at the same height. 5. Test on a dry corner Set two scrap parts inside the rails and clamp them lightly with their joint still visible. Check the scrap angle independently after the clamps are on. Apply release tape only on the exposed floor where squeeze-out might collect. Keep the reference faces and their corner clear so tape thickness does not alter the fit. Check at the bench: Verify the angle on the workpieces themselves. FINAL CHECK After curing, repeat the 4½, 6, and 7½ inch triangle check. Then compare two dry test pieces aligned in the jig with a reliable square. Check the work directly each time so any movement from glue or clamps is caught at the joint. FULL PLAN AND DRAWINGS In the offline site folder, open plans/glue-up-reference-square.html for measured drawings, hole locations, and fixes.