OFFCUT JOURNAL · PROJECT BRIEF Small Freestanding Wooden Trellis for Indoor Vines FINISHED SIZE (WIDTH × DEPTH × HEIGHT) 10 × 6 × 12¾ in. BEFORE YOU CUT The stand is 10 × 6 × 12¾ in. with three 8 in. rungs. Choose a level surface wide enough for the entire base and for the plant to stand separately beside it. Guide flexible, light stems with loose plant ties. Hold a scrap at the proposed rung heights before cutting. If a short stem has to bend sharply to reach the lowest rung, let it grow on before tying it. CUT LIST (LENGTH × WIDTH × THICKNESS; DOWELS: DIAMETER × LENGTH) A · Base · Cut 1 · ¾ in. plywood · 10 × 6 × ¾ in. B · Post · Cut 2 · ¾ in. solid wood · 12 × ¾ × ¾ in. C · Post brace · Cut 4 · ¾ in. solid wood · 1¾ × 1½ × ¾ in. D · Rung · Cut 3 · ¾ in. solid wood · 8 × ¾ × ¾ in. SUPPLIES 12 #6 × 1¼ in. flat-head wood screws Wood glue, clear interior finish and soft plant ties Offcuts for spacers and a backer for drilling TOOLS Square, tape measure and pencil Clamps, drill, clearance bit, pilot bit, depth stop and countersink Sanding block, 120- and 180-grit paper and eye protection BUILD STEPS 1. Set the grid from a centerline Mark the posts on the base from the same left edge. Their left faces go at 2 and 7¼ in. Both front faces sit 2⅝ in. behind the front edge. Center the braces front to back on the posts, using a ¾ in. scrap between each pair of blocks while you draw their footprints. Check at the bench: Each brace projects ⅜ in. beyond both post faces. 2. Drill into the feet from below All six base holes sit 3 in. from the front edge. Measured from the left they are 1⅝, 2⅜, 3⅛, 6⅞, 7⅝ and 8⅜ in. Drill clearance holes through the base and countersink the screw heads flush on the underside. Align and clamp the braces and posts in their footprints while piloting into each lower end through its base hole. Check at the bench: All screw heads sit flush with the underside. 3. Keep the posts plumb as a pair Sand the visible faces. Apply a thin layer of glue under the posts and braces and along the brace faces that contact the posts. Drive the six screws. Check both sides of each post with a square and sight across the front faces. A straight scrap laid across both fronts should touch them evenly. Check at the bench: A straight scrap touches both post fronts evenly. 4. Hang the rungs at equal intervals From the installed bottom edge of the posts, place the lower edges of the rungs at 2⅞, 6⅜ and 9⅞ in. Set their left ends 1 in. from the base’s left edge. Clamp all three to the post fronts. From the rear of each post, drill a centered clearance hole at the midheight of each rung, then pilot through that hole into the rung. Glue the contact faces and fasten from the back. With the heads flush, a 1¼ in. screw passes through the ¾ in. post and enters the rung by ½ in. Check at the bench: Measure the gaps at both posts before driving screws. 5. Set the plant beside it After the finish cures, set the trellis upright on its intended surface and put the plant beside the base. Guide the stems toward it one at a time. Allow enough slack in the ties to move the saucer. Think through how you will release the ties when you rotate or repot the plant. Check at the bench: Slide the saucer free without pulling on a stem. FINAL CHECK Press each corner of the base to check for rocking, then gently tug each rung at its middle. Look along each post for a split at the rear screw holes. Add the plant ties only when the trellis remains steady on its own. FULL PLAN AND DRAWINGS In the offline site folder, open plans/freestanding-tabletop-trellis.html for measured drawings, hole locations, and fixes.