OFFCUT JOURNAL · PROJECT BRIEF Wooden Espresso Portafilter Tamping Dock FINISHED SIZE (WIDTH × DEPTH × HEIGHT) 7 × 7 × 2¼ in. BEFORE YOU CUT The bare dock is 7 × 7 × 2¼ in. The opening between cheeks is 2¾ in. wide and 1½ in. high above the base. Check the width of the part of the head that hangs between the cheeks, the width across the support surfaces that land on the cheeks, and the drop from those surfaces to the lowest piece of metal. Check the handle where it leaves the head as well as at the grip. Choose pad thickness and cheek spacing after a dry fit. The head needs to seat on two sound points and stay level under light hand pressure without using its spout as a prop. CUT LIST (LENGTH × WIDTH × THICKNESS; DOWELS: DIAMETER × LENGTH) A · Base · Cut 1 · ¾ in. plywood · 7 × 7 × ¾ in. B · Landing cheek · Cut 2 · 1½ in. solid wood · 4¾ × 1⅝ × 1½ in. SUPPLIES ¾ in. plywood for the base 1½ in. actual-thickness hardwood for both cheeks Four #8 × 1½ in. wood screws Interior wood glue Two removable thin washable nonslip pads Optional removable fitted solid shim for the specific portafilter TOOLS Calipers or rule, square and pencil Saw and sanding block Drill, clearance and pilot bits, depth stop and countersink Clamps and a scrap for the screw test BUILD STEPS 1. Measure the metal at the intended height Set the empty cool portafilter on a towel and measure near the intended supporting shoulder. Make a simple gauge by spacing two scrap blocks 2¾ in. apart. Lay your thin pads over the blocks and set the portafilter on them. The supporting shoulder should overlap both cheeks and the rest should clear the opening. If the shoulder falls between the blocks, reduce the spacing and make sure the lower metal still clears. Check at the bench: Measure beyond the advertised basket diameter. 2. Cut the base and make two matching cheeks Cut A to 7 × 7 in. from flat plywood. Cut two B cheeks to 4¾ × 1⅝ in. from the same 1½ in. stock. Place them one inch back from the front, with their left faces at ½ and 4⅞ in. Mark inside and outside faces. Recheck the actual opening at the front and the back before using the glue. Check at the bench: Check the gap at both ends. 3. Try the handle path and trim removable pads Cut two pads slightly smaller than the top faces of B so you can peel them off without catching the head. Place the handle over the front one-inch margin, then rotate the entire portafilter to the grip you will use. If the handle touches the left cheek first, shift the head or retest the position before moving any cut line. Make sure you can lift the metal out without pulling the pads off the wood. Check at the bench: Lift the grip without shifting the pads. 4. Drill four centers through the base On the underside of A mark x = 1⁵⁄₁₆ and 5¹¹⁄₁₆ in. from the left, with y = 2 and 4¾ in. from the front. Set the cheeks back on those marks and clamp. With a scrap stack for depth reference, drill clearance through the base and pilots into the cheeks. Countersink only until the head is flush. Check that the tips stay within both cheeks at the tested depth. Check at the bench: Prove the tip stays inside the wood. 5. Glue, clamp and fasten the measured opening Spread glue over both cheek footprints and set B over the marks. Use two removable spacers to hold the opening equal front and back. Drive the screws from below, recheck parallelism, and clean any glue that would prevent the pads from sitting flat. Round the outer corners lightly after the glue has cured but leave both landing faces level. Check at the bench: Keep squeeze-out away from the pad area. 6. Rehearse tamping with an empty basket Allow the surface treatment to cure per its label. Set the dock on a dry, level counter with nonslip pads where you proved they belong. Rehearse the motion with the cool empty portafilter before adding grounds. If the portafilter rocks, lifts one pad, or bears on a spout, stop and change the fit. Choose a dedicated manufacturer-recommended station if you cannot get steady support in this layout. Check at the bench: Test with the basket empty and cool. FINAL CHECK Set down the empty cool portafilter several times using your normal grip. It should land level on both pads without touching the lowest spout to the base. Press with light hand pressure first. The dock should stay flat and its screw heads should sit flush underneath. FULL PLAN AND DRAWINGS In the offline site folder, open plans/espresso-portafilter-tamping-dock.html for measured drawings, hole locations, and fixes.