OFFCUT JOURNAL · BENCH CARD How to Draw a 1:6 or 1:8 Dovetail Slope Draw a square reference line and decide how far along it you can measure on a flat piece of scrap. The dovetail ratio tells you how far to move sideways from the end of that line. A longer, readable drawing helps you see a poor fit before comparing a small angle at the joint. WORKED EXAMPLE ½ in. and ⅜ in. across 3 in. On a perpendicular reference 3 in. long, a 1:6 slope moves sideways 3 ÷ 6 = ½ in. A 1:8 slope moves 3 ÷ 8 = ⅜ in. Mark the two offsets from the same point and connect each to the origin. Their endpoints are ⅛ in. apart at 3 in. of run, with 1:6 the wider departure from the perpendicular. Compare dovetail rise over three inches For a 3 in. run, measure ½ in. or ⅜ in. sideways and see which mark the guide reaches when its bearing face is seated. FULL METHOD AND DRAWINGS In the offline site folder, open field-notes/lay-out-dovetail-slope-by-rise-and-run.html. SOURCES lostartpress.com · Crucible dovetail template https://lostartpress.com/collections/tools/products/crucible-dovetail-template